[1] Lu W. X., Zhang L., Zhang L. H. Contract Completeness’s Effect on Contactors’ Opportunistic Behavior and The Moderating Role of Interdependence[J]. Journal of Construction Engineering and Management (SSCI/SCI)
[2] Lu W. X., Zhang L. H. and Li Z. Influence of Negotiation Risk Attitude and Power on Behaviors and Outcomes When
Negotiating Construction Claims[J]. Journal of Construction Engineering and Management, 2014, 141(2): 04014069. (SSCI/SCI)
[3] Lu W. X., Zhang L. H. and Pan J. Identification and Analyses of Hidden Transaction Costs in Project Dispute Resolutions[J]. International Journal of Project Management, 2015(33):711-718. (SSCI/EI)
[4] Lu W. X. and Liu J. Research into the moderating effects of progress and quality performance in project dispute negotiation[J]. International Journal of Project Management, 2014,32(4): 654-662. (SSCI/EI)
[5] Lu W. X. and Wang H. Organizational Responses to Institutional Pressures in International Infrastructure Projects: A Transnational Pipeline Project Case Study[C]. 2014 ARCOM Conference Proceedings. Portsmouth, UK, 2014.
[6] Chen Y. Q., Lu H. Q., Lv W. X. and Zhang N. Analysis of project delivery systems in Chinese construction industry with data
nvelopment analysis (DEA) [J]. Engineering, Construction and Architectural Management, 2010, 17(6): 598-614. (EI)
[7] Nie J. M., Lv W. X. and Liu X. J. Research of the bargaining process in construction claim with discount factor[A]. Proceedings-2009 International Conference on Management and Service Science [C]. Beijing, China, 2009. (EI)
[8] Lv W. X. and Nie J. M. Study of the Dynamic Game in Change Pricing between Owner and Contractor[A]. Proceedings-2008 4th International Conference on Wireless Communications, Networking and Mobile Computing[C]. Dalian, China, 2008. (EI)